SHIRE VALLEY TRANSFORMATION PROJECT

Project name: Chikwawa water supply project shire valley transformation program
Contractor: SINOHYDRO Corp Ltd
Supervising Consultant: Korean Rural Community Corporation (KRC) jv Dasan & ISAN Ltd
Contract Price: USD 6,474,521.91

PROJECT ELEMENTS
- Intake at the canal with 2 No. pumps abstracting raw water
- A pumping mainline of 250mm diameter ductile iron pipe
- A full conventional water treatment plant (3,326m³/Day capacity or 3,326,400 litres per day )
- A pumping house with 2No. pumps
- An elevated steel tank of 500,000 litres capacity
- A 200mm PVC transmission and distribution pipeline, 4.1km long taking the water to Chikwawa township